China → Russia & Central Asia · wheel blocks and travel units
Mon–Sat, 09:00–18:00 (GMT+8) WhatsApp +86 150 2691 4172

Company · Quality

What is checked before a unit ships

Two different things get called quality: what the supplier inspects, and what the buyer receives on paper. This page is mostly about the second — and about what we do not claim.

Before production

Three things are fixed in writing

  1. 01The specification. Wheel, housing, bearings, seals, mounting, surface protection — named, not implied by a photograph.
  2. 02The drawing. a1, b1, b2, c1, h1 and the centre height, compared against your frame before the order is released.
  3. 03The material. Ductile iron GGG 70 or die-cast aluminium, and the tread material, stated per position.

Documents

What can come with the shipment

DocumentWhenWhat it shows
Packing listEvery shipmentQuantity, case dimensions, gross and net weight per case.
Commercial invoiceEvery shipmentDescription, quantity, value, terms as agreed.
Material certificateOn requestHeat or batch of the wheel and housing material, issued by the material supplier.
Dimensional reportOn requestMeasured a1, b1, b2, c1, h1 against the confirmed drawing.
Third-party inspectionOn request, quoted with the orderUltrasonic, hardness or magnetic-particle testing by an independent laboratory, to the standard named in the enquiry.
Certificate of originOn requestChinese origin, for customs and for tenders that require it.

The first two accompany every shipment. The rest are issued on request and are named in the quotation, so that nobody assumes them at the port.

Limits

What we do not claim

  • We do not operate our own laboratory. Anything beyond dimensional checking is carried out by a third party.
  • We do not hold CE, EAC or other certification for these units as a standing claim. If a project requires a certificate, it is quoted against documentation — or we say that we cannot supply it.
  • We do not publish one warranty figure that would apply to every case. It is stated in the quotation.

How to put inspection into the order

Name the standard, the scope and the report you need in the first message. An inspection arranged after production has started usually moves the shipment; arranged before, it is part of the plan.

Cost and who bears it are agreed in the quotation. If a document cannot be issued for a given unit, we say so before the order rather than after it.

Tell us the size and the conditions

We answer with dimensions and scope of supply, not with a catalogue page.

Enquiry

Describe the task — we will answer to the point

The more data in the first message, the faster we can say something useful. If you have little, write it as it is and we will ask.

AddressChina (Shanghai) Pilot Free Trade Zone

What to have ready

There is no form to fill in. Copy this list, put in what you know, and send it by WhatsApp or e-mail — a drawing or a nameplate photo replaces half of it.

  • Model or full unit designation
  • Nameplate photo, if the unit is already in service
  • Quantity, pcs
  • Load per wheel, rail type, travel speed
  • Operating conditions: environment, duty, temperature
  • Required date and destination
Open WhatsApp

Write an e-mail: tianxiafox@gmail.com

Not sure what a value means? Connection dimensions · How to send an enquiry

WhatsApp